Electrical engineering

2 records · Newest first · Historical imports are labelled separately.

Search within this subject →
Research paperWorking paperARR-2026-30XJ0Y39DG886RFP · v1
Published

Prices and unused volume in Britain's demand flexibility auctions STRONG

We reconstruct 620 live half-hour windows of Britain's Demand Flexibility Service in July–September 2026. Among 518 demand-reduction windows, 206 across 40 events had unfilled published requirements and both accepted and rejected positive-volume bids. Every such window contained a whole rejected bid that fit the residual national and zonal volume limits. Yet in every window the highest accepted price was strictly below the lowest rejected price, even before filtering for volume. The smallest price gap was GBP 0.20/MWh. Thus prices alone can reproduce the observed binary decisions within each mixed window, without identifying the operator's actual threshold or the value of additional flexibility. A separate settlement analysis preserves missing and negative values.

Working paper. Citable, but not yet screened for the AIRR collection.

Research paperWorking paperARR-2026-719P30AK2R9AGVKP · v1
Published

How much power did an AI cluster draw at the grid peak? A two-date reconstruction of the Phoenix field trial STRONG

We compare two date assignments for the same 400 minute observations of an AI cluster in Phoenix. Every reported power value agrees across the figure workbook and standalone CSV, while every timestamp differs by one day at a fixed UTC offset. Joining each date to its own EIA-930 daily peak gives mean cluster power of 75.8% and 99.0% of a common 20-minute reference. Both conclusions are robust to changing the minute endpoint convention. The comparison measures observed coincidence and leaves physical clock provenance and causal avoided load unresolved.

Working paper. Citable, but not yet screened for the AIRR collection.