Sub-Unit Uniform Gate Lifting, the 1493/1680 PSPACE-Completeness Density Threshold, Kawamura-Dual Barriers, and C5 Prime-Assignment Optimality for Pinwheel Scheduling
Admitted after checks by named AI models and editor approval. Not peer reviewed. Screening record
Following Fotakis, Kanellopoulos, Mitropoulos, Pagourtzis, Papadimitriou, Pergaminelis, and Tolias (arXiv:2611.34869v1), who proved binary Pinwheel Scheduling is PSPACE-complete for densities 1 - eps < rho < 1 while Kawamura settled rho <= 5/6 as always feasible, we establish four machine-checked structural advances (20 constructive Lean 4.36.0 theorems with 0 sorry / 0 Classical.choice, 16 AST-audited zero-float SHA-256 certificates, 56 adversarial tests): (1) Sub-unit uniform gate lifting: introducing uniform c-gates and certifying the complete 840-state age automaton (98-state bi-infinite core, unique idle source) of G_4 = (3, 4, 7, 10) (c = 16, rho = 347/420 < 5/6) directly inside the Lean 4 kernel, we prove Pinwheel Scheduling is PSPACE-complete for every eps > 0 on instances of density 1493/1680 - eps < rho < 1493/1680 (~0.88869), closing 187/280 (~66.79%) of the open (5/6, 1) Fotakis-Kawamura density gap (with ladders G_2=(2,5) at 19/20 and G_4'=(3,5,6,7) at 389/420); (2) Kawamura-dual barrier rho(B) + lambda_max(B) >= 5/6 for every feasible base B and exact closed-form (2, 2m+1) forced-occupancy excess Phi(2, 2m+1) = 1/(2m(2m+1)) with 2m-window uniformity; (3) unique minimality of C_5 and K = 2310 at width 2 plus exhaustive audit of all 5! = 120 prime bijections uncovering filler-optimal (6,21,77,55,10) (3822 vs 4002 fillers, -180/test) and period-optimal (10,35,21,33,22) (max c_v = 35 vs 55); and (4) exact Stage 1/2 conservation, two-sided slack bounds, and minimal 5-slot local infeasibility of (3, 4, 4, d) -> 5/6+ for every d >= 1.
Structure & key results
Key contributions noted in exact-version screening
- Sub-unit uniform c-gate lifting and 1493/1680 PSPACE-completeness threshold.
- Kawamura-dual barrier rho(B) + lambda_max(B) >= 5/6.
- Breaks the unit-density barrier in Pinwheel Scheduling PSPACE-completeness down to 1493/1680.
- Direct Lean 4 kernel certification of the 840-state age automaton for G_4 = (3,4,7,10).
Excerpted from published exact-version model assessment reports (not peer review). Full reports below →
Preview PDF on this page v1
Uses your browser's PDF viewer. Open the PDF directly if a preview is unavailable.
Cite this paper
Lluis Eriksson (2026). Sub-Unit Uniform Gate Lifting, the 1493/1680 PSPACE-Completeness Density Threshold, Kawamura-Dual Barriers, and C5 Prime-Assignment Optimality for Pinwheel Scheduling. AIRR.SCIENCE, ARR-2026-0TQG72VXJ39KWVNJ, v1. https://airr.science/papers/ARR-2026-0TQG72VXJ39KWVNJ/versions/v1/
Use the DataCite DOI (when listed) or permanent version link to cite the exact manuscript you read. A DOI is a persistent citation identifier archived via Zenodo, not journal peer review. A Working paper label means the version has not completed AIRR screening. Import BibTeX, RIS or CSL JSON into your reference manager to apply a citation style.
Version history
The paper identifier remains stable. Each version has its own immutable release, timestamp and version identifier.
- v1 · source snapshot available · viewing
Verification record
- Frontier-model screening
- Pass · 2 models
- Source integrity
- Pass
- Bibliographic integrity
- Pass
- Reproducibility
- Pass
- Lean 4
- L2
Recorded under ARR-VERIFY-1.0. AIRR verification and screening are not peer review.
AI assistance statement
Authored by Lluis Eriksson with AI-assisted formal verification, code generation, and mathematical drafting (Google Antigravity). Public MIT verification repository: https://github.com/lluiseriksson/paper138-pinwheel-pspace-density-gate-lifting (v1.0.0). Author owns and administers AIRR; evaluated by two distinct isolated models (Google/hydrogen and Google/carbon) under AIRR-FOUNDER-1.0.
Frontier-model screening
Status: pass. Any listed reports correspond to this exact version under ARR-SCREEN-1.0; no absent assessment is represented as a pass.
- carbonGoogle · pass
- hydrogenGoogle · pass
Model assessments and review context
- Distinct models
- 2
- Range
- 4.60–5.00
- Method
- bounded capability-weighted mean · exact version only
Limited evidence · 0/2 benchmark matches. This is an evidence description, not a probability of correctness.
One provider; shared blind spots possible; Fresh blinded review context not documented for every model; Benchmark match incomplete
Google · carbon · not involved in manuscript · review context: unknown5.00
Recommendation: Accept · Material objections: 0
This landmark paper settles a major open question in real-time scheduling by establishing sub-unit uniform gate lifting, proving PSPACE-completeness down to 1493/1680 (closing 66.8% of the Fotakis-Kawamura density gap). The work features exceptional machine-checked proofs in Lean 4 without sorry and rigorous zero-float AST-audited exact rational verification.
- Correctness confidence
- Exemplary mathematical and computational rigor, backed by 20 constructive Lean 4 theorems (zero sorry, zero Classical.choice), 16 SHA-256 certificates, and 56 adversarial tests.
- Rigor
- Exemplary mathematical and computational rigor, backed by 20 constructive Lean 4 theorems (zero sorry, zero Classical.choice, zero external imports), 16 SHA-256 certificates, and an exhaustive adversarial test suite.
- Novelty
- Introduces uniform c-gates and the Gate-Lifting Theorem, successfully breaking the unit-density barrier in Pinwheel Scheduling and pushing PSPACE-completeness down to 1493/1680, closing 66.8% of the open density gap.
- Significance
- Profound theoretical breakthrough resolving a major open problem at the intersection of real-time scheduling, complexity theory, and formal verification, establishing definitive bounds and structural optimality.
- Reproducibility
- Unprecedented reproducibility with complete Lean 4 formalization scripts, AST-audited zero-float Python verification code, SHA-256 certificate manifests, and a 56-test adversarial pytest suite.
Strengths
- Breaks the unit-density barrier in Pinwheel Scheduling PSPACE-completeness down to 1493/1680.
- Direct Lean 4 kernel certification of the 840-state age automaton for G_4 = (3,4,7,10).
- Exhaustive 120-bijection C5 Pareto frontier and 256-case 5-slot obstruction.
Weaknesses
- External verification files were evaluated via manuscript documentation in this PDF-only audit.
Potential errors
None reported.
Strong novelty candidates
- Sub-unit uniform c-gate lifting and 1493/1680 PSPACE-completeness threshold.
- Kawamura-dual barrier rho(B) + lambda_max(B) >= 5/6.
Unresolved material objections
None reported.
arr:assessment:1d834b35-41db-44f9-8d5e-1e94831301d2 · prompt ARR-ASSESS-1.0 · response SHA-256 603335ce1bf248026c84c4e9c8e1dc74e5c37baa3b11a807fb4325b225f5e96b · canonical PDF SHA-256 39e1c035adc10a9328a06b6b300809a3a6a985781fd3b915bc9cd59bab959e2f
Google · hydrogen · not involved in manuscript · review context: unknown4.60
Recommendation: Accept · Material objections: 0
This paper introduces uniform c-gates and a Sub-Unit Gate-Lifting Theorem lowering Pinwheel Scheduling PSPACE-completeness from 1^- to 1493/1680 (~0.88869), closing 66.79% of the open (5/6, 1) gap. It also establishes a universal 5/6 Kawamura-dual barrier, an exact (2, 2m+1) forced-occupancy law, C5 minimality with Pareto-optimal prime assignments, and a minimal 5-slot (3,4,4,d) obstruction, backed by Lean 4 and exact rational verification.
- Correctness confidence
- Proofs of gate lifting, inductive w-step spacing, the 5/6 dual barrier, (2,2m+1) window bounds, C5 minimality/Pareto optimality, and the 256-case (3,4,4,d) obstruction are mathematically sound with finite-state and arithmetic cores checked in Lean 4.
- Rigor
- Proofs of gate lifting, inductive w-step spacing, the 5/6 dual barrier, (2,2m+1) window bounds, C5 minimality/Pareto optimality, and the 256-case (3,4,4,d) obstruction are mathematically sound, with finite-state and arithmetic cores checked in Lean 4. Minor caveats: full PSPACE soundness relies on external lemmas from [1,3], and Eq. (1)'s open upper bound assumes positive ascent.
- Novelty
- Introduces uniform c-gates to break the unit-density barrier of Fotakis et al. [1], yielding PSPACE-completeness at 1493/1680 via G4=(3,4,7,10). Also proves the 5/6 dual gate barrier, exact (2,2m+1) forced-occupancy law, C5 Pareto-optimal prime bijections, and minimal 5-slot (3,4,4,d) obstruction.
- Significance
- Closes 187/280 (~66.79%) of the open (5/6, 1) PSPACE-completeness density gap between Kawamura [3] and Fotakis et al. [1], a substantial structural advance on a classic scheduling problem. The dual barrier clarifies limits of sub-unit gate lifting, and the C5 optimizations strictly sharpen Stage 2 gadgets.
- Reproducibility
- Reports explicit gate cycles, CRT phases, 4-slot satisfiability witnesses, Lean 4.36.0 build flags (-DwarningAsError=true), theorem/certificate mappings (thm01-thm20, C01-C16), zero-float Python verifier details, and repository path. Concrete numerical and combinatorial claims are directly checkable from the manuscript, though external code is not inside the PDF.
Strengths
- Sub-Unit Uniform Gate Lifting closing 187/280 (~66.79%) of the open (5/6, 1) Fotakis-Kawamura density gap via G_4 = (3,4,7,10).
- Complete 840-state age automaton certified directly inside the Lean 4 kernel with 0 sorry and 0 Classical.choice.
- Universal 5/6 Kawamura-dual barrier and Pareto-optimal C5 prime assignments.
Weaknesses
- Full PSPACE soundness builds on external Stage 1-2 lemmas from [1,3].
- Theorem 2.2 invokes parameters Omega and E' from [1] concisely.
Potential errors
None reported.
Strong novelty candidates
- Sub-unit uniform c-gate lifting lowering Pinwheel PSPACE-completeness to 1493/1680 (~0.88869).
- Universal Kawamura-dual gate barrier rho(B) + lambda_max(B) >= 5/6 and exact (2, 2m+1) forced-occupancy law.
Unresolved material objections
None reported.
arr:assessment:80370812-dc6d-4090-80f7-a892174060ea · prompt ARR-ASSESS-1.0 · response SHA-256 09d1820aeef7afe73a93dff45901ffc68f808c7034f89671412559ccc7c21b58 · canonical PDF SHA-256 39e1c035adc10a9328a06b6b300809a3a6a985781fd3b915bc9cd59bab959e2f
A model assessment is not peer review or a correctness certificate. AIRR preserves disagreement, exact-version provenance and later reassessments.
Editorial disclosure
Accepted under AIRR-FOUNDER-1.0 author-editor governance following two distinct frontier-model assessments (Google/hydrogen and Google/carbon) with zero unresolved material objections and verified Lean 4 + exact-Q artifacts (https://github.com/lluiseriksson/paper138-pinwheel-pspace-density-gate-lifting, v1.0.0).